Tekvel Park

IEC 61850 Digital Substation Lifecycle Management System


Tekvel Park is the overall digital substation lifecycle management system supporting engineers on different stages of the project: from design to maintenance.

Do not get lost in digital substation networks!

Learn more

XXXXIII семинар МЭК 61850

Digital Substation Trainings

Outstanding public and in-house trainings
LAN for power utilities IEC 61850 Digital Substation Design Digital Substation Maintenance

Learn more

Next scheduled training: XXXXIII семинар МЭК 61850

8 — 12 February 2021, Москва, Россия

Registration Program Pricing

Transmission of data structures in a GOOSE message
Transmission of data structures in a GOOSE message

GOOSE-messaging has been covered a lot in many technical papers and to add anything valuable to the subject is rather difficult. But we will try. And functional constrained data will help us with that.

Software Based Centralized Protection: commissioning experience
Software Based Centralized Protection: commissioning experience

In 2018 Tekvel signed several contracts to commission centralized protection system based on servers and independent software. In this article we would like to share our experience and discuss some of the problems, that might require special attention from utilities on the way to mass deployment of centralized PAC systems.

Alex Apostolov about the past, present and the future of relay protection
Alex Apostolov about the past, present and the future of relay protection

The new episode of Big Energy, produced by Tekvel team, is already on YouTube. This time we met Alex Apostolov - editor-in-chief of PAC World magazine and principal engineer of OMICRON electronics - who is one of the most well-known and reputable protection and control engineers in the world. Enjoy, like and share with engineers community!

Time synchronization — vulnerability of digital substation?
Time synchronization — vulnerability of digital substation?

In papers and presentations you can often meet statements like 'No time synchronization — no digital substation' or 'Loss of time synchronization leads to malfunction of protection and control (PAC) functions in digital substation'. Is it really true? Let's find out.